Adding a schedule component from the palette

In your station you can copy a new schedule component directly from the schedule palette sidebar.
Prerequisites: You are connected to an open station.
  1. Open the schedule palette.
  2. Drag a schedule component, such as BooleanSchedule or CalendarSchedule, to one of these locations:
    • In the Nav tree, onto a folder in your station
    • In the view pane, onto the Wire Sheet or Property Sheet view of a folder in your station
  3. In the Name window, give the schedule a name or use the default name and click OK
    The schedule or calendar is now in your station, with default values.
  4. Double-click your new schedule to display its scheduler view. At this point, you configure the schedule by adding events.
 
NOTE: You can open a chart view in the schedule component. A BooleanSchedule, EnumSchedule and NumericSchedule is chart-able. This is useful in determining when a state change is expected to occur.